WFLHD Detail Drawings
Detail drawings are used on a continuing basis within each division to clarify the work required in the plans. WFLHD Detail Drawings are arranged by FP section. If you have any questions or comments concerning these detail drawings please contact the Project Development Team.
The drawings are available in Acrobat (PDF) and MicroStation (DGN) formats. Select the appropriate drawing number to view the drawings in Acrobat (PDF) fromat. The
icon indicates that the DGN file contains both Metric and US Customary (USC) Detail drawings. To get the desired units drawing, choose the pertinent model (File -> Models). All other DGN downloads contain drawings of a single unit (Metric or USC).
| Terms, Formats, and Definitions | Approved | Revised | Download | |
|---|---|---|---|---|
| W101-1 WM101-1 |
Plan Symbols and Abbreviations ["X30" Mapping] | 11/2001 | 1/2007 | |
| W101-1A WM101-1A |
Plan Symbols and Abbreviations ["X21" Mapping] | 11/2001 | 6/2007 | |
| Sections | View | ||||
| Erosion Control | Approved | Revised | Download | |
| W157-20 WM157-20 |
Sediment Wattle | 9/2007 | ||
| Sections | View | ||||
| Earthwork | Approved | Revised | Download | |
| W200-2 WM200-2 |
Standard Oregon Road Approach | 12/2002 3/1996 |
12/2002 |
USC Metric |
| W200-4 WM200-4 |
Standard Washington Road Approaches | 3/2003 3/1996 |
2/2004 | USC Metric |
| W200-5 WM200-5 |
Standard Idaho Road Approach | 3/2003 3/1996 |
3/2003 |
USC Metric |
| Sections | View | ||||
| Gabions | Approved | Revised | Download | |
| W253-1 WM253-1 |
Gabion Basket [Formerly W(M) 253-50] | - | 2/2008 | |
| W253-2 WM253-2 |
Gabion Faced Wall [Formerly W(M) 253-51] | - | 2/2008 | |
| W253-3 WM253-3 |
Gabion Faced Wall [Formerly W(M) 253-52] | - | 2/2008 | |
| Sections | View | ||||
| Minor Concrete Structures | Approved | Revised | Download | |
| W601-10 WM601-10 |
Reinforced Concrete Headwall [Formerly W(M) 601-50] | 11/2006 | ||
| Sections | View | ||||
| Corrugated Metal Spillways | Approved | Revised | Download | |
| W606-10 WM606-10 |
Spillway Assembly with Down Drain [Formerly WM 606-50] ![]() |
4/2009 3/1996 |
4/2009 |
|
| W606-14 WM606-14 |
Pipe Anchor Assembly ![]() |
4/2009 | ||
| WM606-51 | Spillway Assembly with Down Drain and Slip-Joint | 3/1996 | Metric | |
| WM606-52 | Spillway Assembly with Half-Round Down Drain | 3/1996 | 3/2000 | Metric |
| WM606-53 | Corrugated Metal Spillways & Inlet | 3/1996 | Metric | |
| Sections | View | ||||
| Guardrail | Approved | Revised | Download | |
| W617-83 WM617-83 |
Removable Steel-backed Log Rail (3 sheets) ![]() |
3/2009 | ||
| Sections | View | ||||
| Fence, Gates, and Cattle Guards | Approved | Revised | Download | |
| WM619-20 | Residential Chain Link Fence | 3/1996 | Metric | |
| WM619-21 | Residential Chain Link Hardware and Gate | 3/1996 | Metric | |
| WM619-22 | Chain Link Fence | 3/1996 | Metric | |
| WM619-23 | Chain Link Hardware and Gate | 3/1996 | Metric | |
| WM619-40 | Alaska Wire Fence and Gate | 3/1996 | Metric | |
| WM619-50 | Idaho Right-of-Way Fences | 3/1996 | Metric | |
| WM619-51 | Idaho Gates | 3/1996 | Metric | |
| WM619-52 | Idaho Fencing Braces | 3/1996 | Metric | |
| WM619-53 | Idaho Standard Barbed, Woven, Mesh, Combination Wire Fences, and Fencing Applications | 3/1996 | Metric | |
| WM619-60 | Montana Fence | 3/1996 | 5/2000 | Metric |
| WM619-61 | Montana Entrance Gates | 3/1996 | Metric | |
| WM619-62 | Montana Fencing Applications | 3/1996 | Metric | |
| WM619-70 | Oregon Right-of-Way Fences | 3/1996 | Metric | |
| WM619-71 | Oregon Right-of-Way Gates | 3/1996 | 5/2000 | Metric |
| WM619-80 | Washington Fence | 3/1996 | Metric | |
| WM619-81 | Washington Gate | 3/1996 | Metric | |
| Sections | View | ||||
| Monuments and Markers | Approved | Revised | Download | |
| W621-1 WM621-1 |
Right-of-Way Monumentation | 5/2003 | 11/2007 | |
| Sections | View | ||||
| Trees and Shrubs Planting Methods | Approved | Revised | Download | |
| W626-1 WM626-1 |
Trees and Shrubs Planting Methods [Formerly WM 626-50] | 12/2006 | ||
| Sections | View | ||||
| Permanent Traffic Control | Approved | Revised | Download | |
| WM633-1 | Traffic Delineators Alaska Projects | 3/1996 | Metric | |
| WM633-4 | Traffic Delineators Idaho Projects | 3/1996 | Metric | |
| WM633-5 | Traffic Delineators Oregon Projects | 3/1996 | Metric | |
| W633-7 WM633-7 |
Permanent Sign Installation Wood Posts | - | 10/2007 | |
| W633-60 WM633-60 |
Montana Delineators [Formerly WM 633-2] | 11/2006 | 1/2008 | |
| W633-80 WM633-80 |
Washington Delineators [Formerly WM 633-3] | 1/2008 | ||
| Sections | View | ||||
| Permanent Pavement Markings | Approved | Revised | Download | |
| W634-1 WM634-1 |
Pavement Markings Symbols and Words | 3/2003 12/2000 |
10/2007 | |
| W634-2 WM634-2 |
Linear Pavement Markings | - | 10/2007 | |
| Sections | View | ||||
| Temporary Traffic Control | Approved | Revised | Download | |
| W635-20 WM635-20 |
Construction Sign Installation Wood Posts [Formerly W(M) 635-2] | 12/2006 | ||
| Sections | View | ||||
| Roadside Development | Approved | Revised | Download | |
| W(M)646-1 | Mailbox Turnout and Installation | - | ||
| W(M)646-2 | Mailbox Assembly | - | ||
| Sections | View | ||||
| Mailbox | Approved | Revised | Download | |
| WM670-50 | Mailbox Turnout and Installation | 3/1996 | Metric | |
| WM670-51 | Mailbox Assembly | 3/1996 | Metric | |
| Sections | View | ||||
