WFLHD Supplements for Chapter 9 - Highway Design
Supplements are available for the following sections of the PDDM:
9.1.3 Exceptions to Design Standards
Supplement 9.1.3.4-1
Documenting Design Exceptions with Form WFLHD-3 (Acrobat, 67 KB), 4 pages
- Purpose: This supplement provides guidance in documenting exceptions to Highway Design Standards within WFLHD using the WFLHD-3 (Highway Design Standards) form.
- Approved: 10/11/2007
- References:
- Download
WFLHD-3 (Word, 327 KB)
- Mitigation Strategies for Design Exceptions - FHWA-SA-07-011
9.6.1 PS&E Package
Supplement 9.6.1-1
PS&E Package Signoff Process (Acrobat, 40 KB), 2 pages
- Purpose: This Supplement describes the process for submitting the completed PS&E package to Contracts at Signoff.
- Approved: 3/17/2008
- References:
-
Signoff Book Cover (Word, 87 KB)
-
Signoff Package to PS&E Checklist (Word, 127 KB)
-
Samples of signoff documents (Acrobat, 2.23 MB) - placed in blank signoff book
9.6.3 PS&E Development at Various Stages of Design
Supplement 9.6.3-1
PS&E Development at Various Stages of Design (Acrobat, 24 KB), 1 page
- Purpose: This supplement describes the design process in WFLHD.
- Approved: 10/11/2007
- References:
- View WFLHD Design Process
9.6.4 Reviews
Supplement 9.6.4-1
WFLHD Design Review Procedures (Acrobat, 47 KB), 2 pages
- Purpose: This supplement describes the procedures for submitting a project package of plans, specifications, and cost estimate (PS&E package) for review at project milestones listed in the project specific Project Management Plan.
- Approved: 5/11/2007
- References:
- PS&E Review Comments - single user version of spreadsheet
-
QA/QC Checklist (Excel, 1.34 MB)
Supplement 9.6.4.4-1
Title Sheet Signatures (Acrobat, 82 KB), 1 page
- Purpose: The purpose of this supplement is to provide guidance for obtaining approval of the project title sheet and preparing a digital version of the final title sheet.
- Approved: 3/17/2008
- References:
- Sample Title Sheets
9.6.5 Plans
Supplement 9.6.5-1
Standard Format for Plans (Acrobat, 431 KB), 19 pages
- Purpose: This supplement explains the standard format, drafting standards, and organization of the project plans created within and for WFLHD.
- Approved: < DRAFT >
- References:
- Sample Plans
- FLH CADD Level Library
- Download old Procedure 9.6.A-1
booklet (Acrobat, 729 KB)
- Download old Procedure 9.6.A-1
booklet w/Sample Sheets (ZIP Archive, 6.62 MB)
- Tabulation spreadsheets
- Cell libraries
9.6.6 Supporting Information
Supplement 9.6.6.1-1
Computation of Quantities (Acrobat, 84 KB), 1 page
- Purpose: The purpose of this Supplement is to clarify how various quantities are to be calculated.
- Approved: 12/15/2006
Supplement 9.6.6.2-1
Design Book Assembly (Acrobat, 155 KB), 9 pages
- Purpose: The purpose of this Supplement is to provide general guidance for organizing the project design files into the Design Book.
- Approved: 3/17/2008
- References:
-
Design Book Index (Word, 62 KB)
-
CADD and Geopak Tracking Document (Excel, 32 KB)
Supplement 9.6.6.6-1
Design Narrative (Acrobat, 24 KB), 2 pages
- Purpose: The purpose of this Supplement is to describe the Design Narrative prepared for the Construction Project Engineer.
- Approved: 12/15/2006
- References:
-
Design Narrative Template (Word, 66 KB)
Supplement 9.6.6.6-2 PE Hold File Checklist, ? pages
- Purpose: This Supplement provides guidance for assembling the PE Hold File Checklist.
- Approved: < FUTURE >
- References:
-
PE Hold File Checklist (Word, 85 KB)
-
Important Notice Letter (Word, 58 KB) - to be included when CADD files are provided
9.6.7 Computation of Construction Schedule and Contract Time
Supplement 9.6.7-1 Developing Constructions Schedules, ? pages
- Purpose: This supplement provides WFLHD guidance for developing construction schedules in order to determine contract time.
- Approved: < FUTURE >
- References:
-
CPM Tips (Acrobat, 206 KB)
-
CPMs Made Easy (Acrobat, 719 KB)
-
PS&E to NTP Calculator (Excel, 84 KB)
9.6.8 Engineer's Estimate
Supplement 9.6.8.5-1
Development of Prices (Acrobat, 140 KB), 2 pages
- Purpose: This supplement explains how prices are developed at the various project development review stages.
- Approved: 3/17/2008
Supplement 9.6.8.6-1
Assessment of Cost Uncertainties and Risks (Acrobat, 722 KB), 3 pages
- Purpose: This supplement explains the procedure for including Adjustments for Price Fluctuations into a contract.
- Approved: < DRAFT >
- References:
-
Fuel Escalation Cost Worksheet (Excel, 84 KB)
-
Sample Justification (Acrobat, 276 KB)
9.6.9 Specifications
Supplement 9.6.9.3-1 Writing Special Contract Requirements, ? pages
- Purpose: This supplement provides WFLHD guidance for creating special contract requirements (SCR) for the PS&E package.
- Approved: < FUTURE >
- References:
- WFLHD Library of Supplemental Specifications
- Specification Writers' Guide
9.6.11 Quality Control and Quality Assurance
Supplement 9.6.11.2-1 QA/QC Checklist, ? pages
- Purpose: This Supplement provides guidance for using the QA/QC Checklist
- Approved: < FUTURE >
- References:
-
QA/QC Checklist (Excel, 1.34 MB)
Highway Design | PDDM - Chapter 9 - WFLHD Supplements | Top